Physical Dimensions

Metric Imperial Metric Notes
Total Height1,388 ft423 mIncluding mechanical penthouse
Roof Height1,283 ft391 mArchitectural roofline
Total Floors60Above grade
Below Grade4Basement levels
Gross Floor Area2,500,000 sq ft232,258 m²Total enclosed space
Net Rentable2,000,000 sq ft185,806 m²Estimated usable
Floor Plate52,000 sq ft4,831 m²Tower floors
Site Area52,000 sq ft4,831 m²Full city block
Floor Distribution
  • Trading (1–8): 8 floors — High-ceiling trading floors
  • The Exchange (13–16): 4 floors — Amenity/dining hub
  • Office (17–55): 39 floors — Standard office space
  • Executive (56–60): 5 floors — Executive offices

Construction Data

Material / SystemQuantityUnitSpecification
Structural Steel46,000tonsHigh-strength steel frame
Concrete150,000cubic yardsHigh-performance mix
Glass Panels12,000+panelsTriple-glazed curtain wall
Elevator Cabs50+unitsHigh-speed passenger + freight
Foundation Depth80feetTo Manhattan schist bedrock
Caissons200+unitsDrilled shaft foundation
Key Milestones
  • Demolition Start: 2019-Q3
  • Demolition Complete: 2021-Q1
  • Foundation Work: 2020-2021
  • Steel Erection: 2021-2023
  • Topping Out: 2023-Q4
  • Substantial Completion: 2025-10-21

Sustainability Metrics

CategoryMetricValueBenchmark
EnergyRenewable Source100%NYS Hydroelectric
EmissionsOperational CarbonNet ZeroAll-electric systems
DemolitionMaterial Recycled97%vs. 75% typical
WaterConsumption Reduction40%+vs. baseline building
EnvelopeU-Value (curtain wall)0.22BTU/hr·ft²·°F
DaylightingFloor Coverage75%+Natural light access
Building Systems
  • HVAC: AI-integrated climate control
  • Shading: Solar-responsive automated screens
  • Lighting: 100% LED with daylight harvesting
  • Water: Greywater recycling + rainwater capture
  • BMS: Integrated management with predictive analytics

Economic Data

CategoryAmount (USD)Source / RecipientNotes
Total Project Cost\$3–4 BillionJPMorgan ChasePrimary Investment
Development Rights\$208,000,000Grand Central Terminal666,766 sq ft
Train Shed Contribution\$50,000,000MTA Sector 2GCT reconstruction
Public Realm Fund\$41,670,000NYC PRIFMidtown East improvements
Demolition Cost\$160,000,000Construction budgetFormer Union Carbide
\$1,200/sfLow Estimate
\$1,400/sfMid Estimate
\$1,600/sfHigh Estimate
MetricValueSource
JPM NYC Annual Impact\$29.8 BillionDeloitte Analysis
270 Park Ave Share\$12.4–17.5 Billion41.7% allocation
Jobs Supported (NYC)40,000+Indirect + Induced
Construction Jobs8,000Peak employment
Union Trades40+Trade organizations

Certifications

Target

LEED Platinum

U.S. Green Building Council highest tier certification.

Target

WELL Platinum

IWBI performance-based human health certification.

Target

Fitwel 2-Star

Evidence-based occupant health design strategies.

Achieved

Net Zero Operations

All-electric with 100% renewable energy supply.